In this article, we will explore in detail Three60, Manchester, a topic of great relevance in contemporary society. Three60, Manchester has captured the attention of numerous experts and academics due to its significant impact on various aspects of daily life. Through meticulous analysis and the collection of empirical evidence, we will seek to shed light on the different nuances and facets that characterize Three60, Manchester, in order to provide a comprehensive and enriching vision on this topic. In addition, the practical and theoretical implications of Three60, Manchester will be examined, in order to promote a deeper and more detailed understanding of its importance in the current landscape.
Three60 | |
---|---|
Former names | The Cylinder Great Jackson Street Plot C5-6 |
General information | |
Status | Completed |
Type | Residential skyscraper |
Location | Manchester, Greater Manchester, England, United Kingdom |
Address | Manchester, M15 4ZD |
Coordinates | 53°28′17″N 2°15′17″W / 53.47151°N 2.25470°W |
Construction started | 2021 |
Completed | 2024 |
Owner | Renaker and Select Property Group |
Height | 154 m (505 ft) |
Technical details | |
Floor count | 51 |
Design and construction | |
Architect(s) | SimpsonHaugh[1] |
Developer | Renaker |
Other information | |
Number of units | 441 |
Website | |
three60newjackson |
Three60 is a cylindrical residential skyscraper in Manchester, England. The building is part of the second phase of the Crown Street development area at the southern end of Deansgate in the city centre, behind the Deansgate Square skyscraper cluster.[2] It was designed by SimpsonHaugh architects.[1][3] At 154 m (505 ft) tall, the 51-storey tower is the joint fourth-tallest building in Greater Manchester alongside its sister tower The Blade.
The planning application was submitted to Manchester City Council in April 2020 for two adjacent towers, The Cylinder (subsequently renamed Three60) and The Blade,[4] to form the second phase of developer Renaker's Crown Street development, consisting of a combined total of 855 apartments across 950,000 sq ft (88,000 m2) of residential space. Three60 will contain 441 apartments.[5] The towers are to be connected at the lower levels by a podium containing 5,200 sq ft (480 m2) of commercial space.[6]
Planning approval was obtained in July 2020.[7]
Construction of the building commenced in 2021.[8] In March 2022, the Greater Manchester Combined Authority approved a £62.3 million loan to Renaker for the development project.[9][10] Three60 was expected to be completed by spring 2024,[11] and confirmation of its completion was announced in May of that year.[12]
The site of the two towers covers 2.7 acres (1.1 ha) and is next to Chester Road roundabout and the Mancunian Way.[6]